![]() |
July 2006 >>>> Pinjarra Power Plant Handover The Pinjarra Unit 1 (Australia) combined cycle
power station was recently handed over to the owners by the contracting team
of Downer and Mitsubishi. |
July 2006 >>>> AutoCAD 2007 and PowerCAD 6 Beta Version released The Elecdes Design Suite is now compatible with
AutoCad 2007 and PowerCAD 6 in Beta Release.
|
July 2006 >>>> New Technical Expert from Latin America Esteban Larrain will be relocating temporarily to Head office (from Chile). Esteban will assist with the integration of the growing list of Elecdes users in Latin America. His field of expertise is training, tech support and development of "Elecdes en Español". New and existing customers can contact him via the link: Contact Information
|
July 2006 >>>> Mindcore (INC) to do North American T&D Training Mindcore T&D Inc have been appointed specialist transmission and distribution trainers for the Elecdes Design Suite in North America. Mindcore are experienced users of EDS who engineer T&D systems. They bring a wealth of experience to the training forum benefiting all T&D users.
|
July 2006 >>>> Traditional Chinese supported. EDS now supports "traditional" Chinese as well as "simplified" Chinese for those who need it.
|
July 2006 >>>> Version 6.1 Latest feature summary. Termination order optimization technology
updated: EDS is now utilizing a modified "kruskels" algorithm to
optimize complex
Project wide data refresh for Tables: EDS has now extended "project wide data updating" to include the tabular data linked to external databases. Once your data is linked the tables are automatically updated upon request - in all documents!
Report and Data traffic speed up: To help speed up the drawing process, we
have optimized the data throughput in
For more new features email us via the link below:
|
Products | Services | Contact Information | News | Home |